
Conformity explains why a measurement passed, failed, was indeterminate, or was not evaluated.
Calculate decisions
- Save the required measurements.
- Complete the required uncertainty evidence.
- Open Conformity decision from the calibration hub.
- Confirm the controlled decision-rule revision.
- Calculate and review each point and stage.
- Resolve blockers and acknowledge authorised warnings where applicable.
Metra freezes the evaluated value, tolerance, uncertainty, guard band, acceptance limits, boundary policy, result, rationale, and controlled rule revision when the event is submitted.
If source measurements or uncertainty change, recalculate conformity before submission. The Metra readiness response identifies stale evidence and the next action.
The frozen rule supplies the method and boundary policy. The saved measurement point supplies its specification limits. Review both: the workspace shows the point tolerances, evaluated value, guard band and resulting acceptance interval. A readable rule name and revision identify the method; they do not establish missing limits.